Projects on Hand
Projects with our Partners
 

 
Telecom Solutions
 

PROJECTS ON HAND

a) Creation of subscriber access networks (last mile access) on Copper and OFC for Bharti Airtel and Reliance Infocomm ltd.

b) Maintenance of Railwire Network (OFC) for Broadband Internet subscribers for Railtel.

c) Repairs of autotrack functionality and AMC for 8.1M Ku band and 11M C band Antennas for BSNL.

d) Integration of BSNL's MPLS network for WAN connectivity for ITI Limited.

e) Integration of Data networks for Mysore Paper Mills at Bangalore and Bhadravati through BSNL land line.

f)Satcom Projects with partners.

Go to top


PROJECTS WITH OUR PARTNERS

Mauritius Projects
• Retrofitting of 15 m Vertex Antenna at Mauritius Telecom
• Retrofitting of 11 m C-Band Antenna at Mauritius
• Retrofitting of 11m C-band Antenna at Rodrigues, Mauritius

Software Technology Park of India
Installation and Commissioning of 9 m C-band Andrew Antenna, 200W TWTA at STPI, Nagpur.
Installation and Commissioning of 9 m C-band Andrew Antenna, 200W TWTA at STPI, Aurangabad.

VSNL Projects at Mumbai, New Delhi and Calcutta
Feed Modification from CP to Linear to NEC/ECIL Make 9 mtr Antenna. This includes Thaicom and Intelsat verification at VSNL Mumbai, VSNL Delhi and Calcutta

ONGC Projects
Upgradation and Maintenance of 11meter Antenna at ONGC Uran and ONGC BHA offshore.

Star News Projects
Installation and Commissioning of 4.5meter for Star News with 400 W ODU HPA on behalf of VSNL at Mahalaxmi, Mumbai.

Video Port for Amrita TV
We have undertaken the installation of 6.2m Vertex antenna along with earth station equipments as listed below for Amrita TV for their video uplinking and downlinking of video channels. The job involves integration of video, audio and RF equipment and commissioning of total system which includes antenna verification test with respect to NOCC for the above vertex antenna, configuring of Tandberg video equipment, optimization of RF parameters for achieving the specified quality as per the customer requirements. Presently stations commissioned and operational.

All India Radio Captive Earth Station
The job involved foundation, mechanical integration of 3.8 mtr Comsat Antenna for the Captive Earth Station of All India Radio Kolkata. The antenna verification tests were performed through NOCC.

VSNL
Dismantling and shifting of five 6Mtr NEC Make Antenna with 2.5KW HPA for VSNL.

All India Radio
Retrofitting of five 6-Mtr Captive Earth Station for All India radio for Analog/Digital Transmission through Bharat Electronics Ltd. (BEL) Bangalore at Bangalore, Ahmadabad, Trivandrum, Bhopal and Hyderabad.

VSNL Noida
Dismantling of 9.4mtr RSI Antenna and Associated ground Communication
Equipment for VSNL Noida.

Software Technology Parks of India Chennai Dismantling of 9.3m Andrew, 3.7m Suman, and 3.8m Prodelin antennae for STPI Chennai.

Bharat Electronics Ltd.
Installation and Commissioning of Ku Band ROT at Gulbarga and Sidhi.

Esselshyam Communications Ltd.
Dismantling and Installation of 4.5m Vertex make antenna at Kolkata.

Videsh Sanchar Nigam Ltd
Supply, Installation & commissioning of linear feed at Mumbai, New Delhi, and Kolkata for roof top antenna.
• Dismantling and Relocating of 13.1 mtr Antenna from ARVI to DIGHI for VSNL operating in INMARSAT
• Relocating of 13.1mtr NEC Make Antenna Along with 3KW HPA (1+1), LNA Controller (1+1) Control systems from VSNL, Kanpur to VSNL, DIGHI. Operating in Intelsat Services

Go to top

All India Radio
Alignment & performance test measurement of C band RN terminal for All India Radio at Surat, Kolhapur, Aurangabad, and Solapur.

ECIL
Installation of 2.4m VSATS with BUC at 14 various locations of survey of India for Tsunami Warning System.

Esselshyam Communications Ltd.
Installation and commissioning of 7.3m Andrew make antenna at Katmandu Nepal for Nepal TV. The antenna verification tests were performed by Thaicom Authorities.

Esselshyam Communications Ltd.
Dismantling Installation & Commissioning of 4.5m Vertex make antenna from Delhi to Kolkata. The antenna verification tests were performed through NOCC.

Arraycom India Ltd. (Jun 2006)
Procurement of antenna control unit ATX 2000 Qty 02 No. for DD Todapur.

DTH Operation at Dish TV, Noida
Dismantling, Installation & Commissioning of 4.6m Andrew make antenna from Bangalore to Noida. The antenna verification tests were performed through NOCC.

Esselshyam Communications Ltd.
Installation and commissioning of 7.3m Andrew make antenna at Mandi House, New Delhi for Doordarshan. The antenna verification tests were performed through NOCC.

Esselshyam Communications Ltd.
Installation and commissioning of 9.3m General Dynamics (Vertex RSI) make antenna at Noida (U.P) for Star News. The antenna verification tests were performed through NOCC.

Integration of Antenna Control System
Integration and commissioning of 10 antenna control systems all over India on behalf of Bharat Electronics Ghaziabad.

PRAGYA TELEPORT (NOIDA)
Installation and commissioning of 9.3m C band ANDREWmake antenna at Noida (U.P). The antenna verification tests were performed through NOCC.

BAG TV
Installation and commissioning of 9m C band VERTEX make antenna at Noida.

ST ELECTRONICS
Installation and commissioning of 9.3m KU band VERTEX make antenna at Singapore.

TATA COMMUNICATION
Dismantling and Installation and commissioning of 13m C and KU band NEC make antenna at Hatikanta.

TATA NET
Installation and commissioning of 6.3m and 4.7m Genral Dynamic make for IAF.

TATA COMMUNICATION
• Dismantling and Installation and commissioning of 13m NEC make antenna at Chennai.
• Dismantling and Installation and commissioning of 6.2m Antenna at dighi.